Sinclair Meats -  Page 3             (Next Page)
The pictures you see below are the building of this cabinet as it is being manufactured at our Townsville Workshop.


S/S Bag Shelves are installed at back under coldplate

Copper Tubes for feeding of gas to coldplates are run and set in place

Second Year apprentice Joshua is putting Thermopaste on tubes on Coldplate
this metalic paste gives the maximum possible cold (heat) transfer, notice how the tubes are s/s strap welded to the plate, this guarantees that they will always
be flat against the plate.

Second Year apprentice Joshua is putting Thermopaste on tubes on Coldplate
this metalic paste gives the maximum possible cold (heat) transfer, notice how the tubes are s/s strap welded to the plate, this guarantees that they will always
be flat against the plate.

Coldplates are installed into cabinets

Coldplates are installed into cabinets, notice holes at rear for pour foam entry

After the Coldplates are installed they must be capped at the joins

In the corner of each Coldplate is a S/S Drain - fully welded